What KEDEN already offers
Kazakhstan’s State Revenue Committee began rolling out KEDEN in 2024. In its 11 November 2026 update, the committee said that transit, vehicle and passenger declarations, as well as goods declarations including those for express shipments, were available electronically. It also reported 12 digitised public customs services, three types of permit documents and 59 integrations with other systems.
The committee dates the launch of the goods declaration module to 11 April 2026. Its list of functions introduced in 2026 includes transit declarations using TIR carnets and automatic submission of a transit declaration through the TIR EPD integration. Two further public services for advance rulings were still planned for year-end when the update was published.
Where electronic filing ends
Successful submission and cargo release are separate events. For a shipment, log submission and acceptance of the data, arrival, any request for correction and confirmation of release separately. Keep the timestamp, a link to the original notice and the person responsible for the next step. Check the current instructions for your procedure for status names and the order of steps.
If the data are sent back for clarification, keep the previous version and note why it changed. This makes it possible to account for document corrections separately when analysing the wait after acceptance. The shipment may be in a queue or undergoing other checks at the same time. Reconcile the intervals before adding figures from separate logs.
How to measure the effect on a shipment
The World Customs Organization’s Time Release Study guide measures the time from arrival of goods to physical release. These are useful boundaries for an overall metric. To identify which stage delayed a particular shipment, add separate timestamps for requests, inspections and completion of other procedures where the data are available.
Compare like shipments at the same crossing, using the same mode and customs procedure over similar periods. State the sample size. Alongside the median, check how long the slowest group of shipments waited. Record changes in inspection counts, opening hours or vehicle flows separately. A shorter interval after filing alone does not establish that the digital service produced the entire improvement.
What to agree before dispatch
Share one version of the shipment data with the customs representative and carrier. Agree who checks documents, receives notices, answers requests and holds confirmation of release. If a technical failure occurs, check the official notice and confirm the current procedure with the competent authority or representative.
The number of services and integrations shows how far implementation extends. Comparable measurements for a specific procedure are needed to assess its value to the carrier. Start by measuring your arrival-to-release interval, then use the log to investigate several delays. This shows where time is being lost and which tasks remain after electronic submission.
