A freight tariff index tracks price changes

Kazakhstan’s Bureau of National Statistics reported an all-mode freight tariff index of 101.0% in October 2026 relative to September 2026 and 97.1% relative to October 2025. These figures use different comparison periods. The index tracks tariffs covered by the survey. A price for a particular shipment depends on shipment details and the quote received.

For cross-country benchmarking, the World Bank’s LPI 2.0 tracks international supply-chain speed and connectivity. Select a specific indicator and mode when comparing routes. Sector turnover, the sector’s GDP share, a freight tariff index and a company’s expenses answer different questions. Estimating logistics costs as a share of the economy would require a common cost accounting method.

Compare quotes for the same service scope

Request prices for the same shipment, addresses, ready date and handling terms. Record weight, volume, pieces, who collects and releases the cargo, and what the quote includes. Confirm the minimum charge, chargeable weight or volume, currency, validity and tax treatment for each line.

Break the quote into pickup, main carriage, handling, documentation, any transshipment, storage, insurance and final delivery. Almaty Airport’s schedule, for example, lists storage and terminal handling separately by cargo category. Compare current offers with a stated billing unit and check which terminal services the carrier has included.

Price a delay under the contract terms

Model two scenarios. In the first, the shipment meets all agreed windows. In the second, release slips or the cargo moves on a later departure. Allow for storage, truck waiting, remobilisation and extra handling in each scenario. Confirm when included time runs out, how billable time is rounded and who records when the clock starts.

If an extra day in transit actually changes inventory carrying costs, estimate that amount separately. Note the source of any assumption and keep it separate from the carrier invoice. The difference between scenarios shows which quote terms to discuss before booking.

Reconcile estimates against a completed movement

For a trial shipment, compare estimates and invoices by operation, then check timings, actual weight and delivered scope. Record the source of differences, including exchange rates or volume rounding. For recurring movements, use a constant measure such as cost per delivered pallet at an equivalent service level. This helps identify where to consolidate loads, move an appointment or revise a terminal process.