What the 2026 rail figures show

On 6 November, Kazakhstan’s Railway and Water Transport Committee reported 12.1 million tonnes of grain carried by rail in January–October 2026, of which 9.4 million tonnes were export shipments. Central Asia accounted for 6.2 million tonnes, including 4.6 million tonnes to Uzbekistan. The committee separately reported 935,000 tonnes to China and 855,000 tonnes to Afghanistan.

These figures show where grain has already moved by rail. A rate request still needs the exact origin and destination stations and an agreed receiving point. For an alternative market such as Iran, ask for a separate quote and check handovers, documents and capacity on the actual route.

Match the wagon to the elevator and lot

Start with how much grain the elevator can prepare and load by the agreed date and how much the consignee can receive in its slot. Specify the crop, weight, loading method and quality requirements in the contract. Before wagons are spotted, agree on sampling, link test results to the lot and decide how to handle a quality or weight discrepancy.

The wagon operator needs the wagon type, spotting station and unloading location. Confirm that the hopper is compatible with equipment at both elevators and is available on the dates. Assess a road shuttle to the elevator or a short haul to the buyer separately. Check the bag count or ability to move bulk grain, weighbridge hours and access to the unloading point.

Agree on documents and cost before spotting wagons

Check with the carrier and documentation specialist which carriage, commercial and phytosanitary documents apply to the specific cargo and destination. Reconcile the cargo description, weight, shipper and consignee across documents. For wheat, separately check whether consignment note and Virtual Warehouse requirements apply. The State Revenue Committee’s 23 November notice identifies four wheat codes subject to requirements from 1 December 2026.

Break the price down into road feeder haulage, elevator services, wagon supply and use, rail carriage, documentation, transshipment and release. Confirm who pays for wagon or truck waiting, how the clock starts and stops and who records those times. Compare offers for the same weight and delivery point.

Build a buffer between harvest and dispatch

Record the lot-ready date, wagon spotting and who has confirmed the unloading slot. Test a scenario in which the grain is late or the consignee moves the slot. Plan for storage, a new spotting date or splitting the lot, and agree who can make that decision. A buffer matters particularly in the season when many lots are shipping at once.