Tie readings to dispatch decisions

Start with two or three decisions the system should support. For example, dispatch needs arrival and unloading wait times, a mechanic needs mileage and engine hours, and a fuel analyst needs fill-up time and volume. Assign an owner and an acceptable reporting delay for each signal.

GPS.gov lists factors that affect position accuracy, including buildings blocking satellite signals and differences in receivers. A tracker can also log positions with weak mobile coverage and send stored records later if the device supports buffering. Check measurement and receipt times separately. An old position is useful as trip history. Confirm the vehicle’s current status separately.

Check fill-ups against multiple records

Review a fill-up alert alongside the time, place, tank level and fuel card or receipt. Geotab’s documentation describes detecting fill-ups from changes in vehicle fuel level, with matched transactions adding details. Diagnostic data availability depends on the vehicle and connection.

For example, if a sensor reports a sudden change in level, check whether the truck was parked on a slope, what time the receipt shows and what a repeat reading on level ground says. Agree who investigates a discrepancy and records its cause. Compare fuel use on similar trips and loads, and log long periods of idling while parked separately.

Check maintenance, tachographs and access

For scheduled servicing, verify the source of mileage or engine hours and compare the figures with the dashboard. For driving and rest time, check whether Kazakhstan’s tachograph rules apply and keep required records separately. Before launch, agree who can see journey history, who corrects an incorrect assignment of a driver and how long records are needed for operations.

Run a pilot on several vehicle types and repeat a trip through weak mobile coverage. Check whether the points returned when coverage resumed, whether fill-ups matched paperwork and whether the mechanic received the service alert in time. Record missing updates and false alerts separately. Base the decision to extend the pilot to the fleet on measured results and whether staff can handle the alerts.

With dispatch, rehearse a dropped update as a truck approaches a terminal. Agree how long a position can be treated as current, when to contact the driver and who updates the arrival estimate in the consignee’s order.