Station, border crossing and terminal
A dry port is an inland logistics terminal. Depending on the facility, it can receive and release freight, transfer and store containers, and organize handovers between rail and road. At the Chinese border, those functions take place where two rail networks meet. Put the station, terminal and operator on a quote request: a single place name can refer to several facilities.
Altynkol–Khorgos: where Khorgos Gateway operates
Altynkol is the Kazakh station at the Altynkol–Khorgos crossing. KTZE – Khorgos Gateway is a separate dry port at the same hub. In July 2026, KTZ Express reported that nine 1,520 mm marshalling tracks and a facility for routine wagon repairs after uncoupling entered service there in September 2025. The operator put the terminal’s annual transshipment capacity after the works at 800,000 TEU, up from 540,000 TEU. One TEU is the equivalent of one twenty-foot container. The figures describe capacity at that terminal. Confirm actual annual volume and slot availability for your shipment separately.
Dostyk–Alashankou: specify the facility
Dostyk is the Kazakh station at the separate Dostyk–Alashankou crossing. Kedentransservice lists facilities at Dostyk with different services for containers, bulk, heavy loads and other cargo. Kazakhstan’s foreign ministry also identifies the Dostyk Trans Terminal separately in the UN ESCAP list of dry ports. When requesting a quote, confirm which facility will handle the shipment and who will document the handover to the next carrier.
At the border, China’s 1,435 mm gauge meets Kazakhstan’s 1,520 mm gauge. A container can be lifted from one flat wagon to another with its contents still inside. The method for other shipments depends on the cargo, wagons and handling equipment available at the facility.
Almaty and Astana: work beyond the border
The consignee’s requirements determine the job on the inland leg. Kedentransservice reports opening the ZHETYSU container terminal in Almaty, and KTZ Express lists the Yesil Transport and Logistics Center as an operating facility. For shipments through Almaty or Astana, agree on the exact terminal and service: consolidating smaller loads, storing containers or releasing one for delivery by truck. The city identifies the delivery area. The carrier needs the terminal details to handle the booking.
What to check in each quote
Ask for the crossing, station and handling facility, along with confirmation that your container type is accepted and a date for the next available slot. Ask for separate handling, storage and pickup charges. Check the free storage period and when the clock starts. Confirm where to return the empty container and who will notify you when the shipment changes hands. Compare quotes for the same services and delivery point.
