Start with one shipment record
A transport management system (TMS) connects orders, routes, rates, carrier operations and settlement. For the first rollout, choose a repeatable route with known partners. Set a shared shipment ID that links the order, vehicle, pieces and documents in one record. Keep planned and actual events distinct, such as the scheduled truck call and its actual entry to the site.
Agree on who sends each event, how it is identified, and how a correction is recorded. Keep the original time with its time zone or UTC offset, along with the separate time the message was received. A resent event should count once. Dispatchers need a revision history and a way to flag a missing update.
Connect telematics with terminal events
Vehicle coordinates can help estimate arrival. Acceptance of a piece is evidenced by a site event, such as a shipment scan or an agreed message from the terminal. Track those separately. Show stale coordinates as such, with the timestamp of the last known location.
In the customer view, show the confirmed phase and time of its last update. In the operations view, retain the source and the reason for any discrepancy. Start with a small exchange between the planner, carrier and warehouse. A register with named event owners and a revision history lets you identify gaps in ordinary data exchange before choosing a more complex ledger.
Check the route and e-CMR separately
On 16 October 2026, the responsible transport committee announced an e-CMR pilot shipment between Kazakhstan and Russia under an EAEU project. On 11 November, the Ministry of Transport reported parliamentary ratification of the additional protocol in Kazakhstan. On 23 November, Kazakhstan was still absent from the UN depositary’s list of parties to that protocol. Domestic approval, treaty status with the depositary and operation of a particular pilot are distinct milestones.
Before the first routine movement, verify the protocol’s current status, the requirements that apply along the route, and whether every authorised party can access the document when needed. Agree on how to confirm it, enter corrections and fall back if connectivity fails. A TMS record and a legally recognised international electronic consignment note serve different purposes.
Evaluate the pilot by its exceptions
For completed trips, check the share of events with a recorded source and correct time, duplicate count, time to resolve a discrepancy and amount of manual entry. Then review cases where data arrived late or conflicted with a warehouse record. Extend the integration when the dispatcher and partner share the same understanding of shipment status and can reconstruct the event history.
