Start with the consignment and the route

For meat, vegetables and other perishables, ask the cargo owner for a written specification before booking. Confirm the transport conditions, the state of the goods on acceptance, co-loading restrictions and how to handle a deviation. The product, contract and applicable requirements determine the conditions. A single temperature range does not fit every consignment.

Map handovers from the shipper through any vehicle, container or terminal to the receiver. Check where the goods may wait, whether the warehouse has a suitable chamber and who monitors conditions during transfer. Agree that cargo and equipment are ready for loading, and check what backup is available if there is a delay. The chain includes the warehouse, the vehicle and the points between them.

Keep vehicle conditions distinct from measurements of the goods

Agree what each sensor measures, where it sits and who downloads the log. A reading of air in the vehicle and a measurement of the goods answer different questions. Log acceptance, door openings during transfer, the handover time and alarms separately. The timestamps and consignment identifier should allow records from different parties to be matched.

If conditions deviate, keep the readings, record the duration and stage, and notify the designated person. Under the agreed procedure, the receiver or cargo owner decides whether to accept the shipment in light of the product requirements. Clearing the equipment alarm is separate from documenting what happens to the goods.

Check the scope of the standards

Kazakhstan’s Ministry of Trade and Integration said ST RK ISO 23412-2026 took effect on 10 May 2026. Its notice covers acceptance, carriage, storage, intermediate transfer and monitoring. International ISO 23412:2020 addresses land delivery of chilled or frozen parcels with intermediate transfer. Its scope is a delivery service, rather than rules for every refrigerated haul or for the quality of the parcel contents.

For international transport of perishable foodstuffs, check whether the ATP Agreement applies. It covers specified carriage and sets equipment and temperature conditions for the foodstuffs listed. Use the current UNECE text and check equipment documents where required. Veterinary, phytosanitary and other requirements are checked separately for the goods and countries on the route.

Match three confirmations before dispatch

Get confirmation that the consignment is ready from the shipper. Confirm conditions, equipment and transfer arrangements with the carrier and terminal. Agree the acceptance and deviation procedure with the receiver. Keep the records and link them to the sensor log. If no one has responsibility for a wait during transfer, settle that before dispatch, while the plan can still change.