The airport and airline have different roles

Start the choice between Almaty and Astana with the requirements of your shipment. Astana’s cargo terminal lists separate contacts for domestic and international cargo. Almaty’s terminal publishes separate storage and handling categories for imports, exports and transfers, including truck-to-air cargo. A service listing helps identify the operator. The carrier confirms capacity and acceptance for the shipment.

Include the number of pieces, actual weight and packed dimensions of each piece, a description of the contents, special handling and the ready date. Ask the carrier to confirm that every piece is eligible on each planned leg and verify the drop-off point, acceptance cut-off and document format. FlyArystan publishes acceptance and dimension approval terms for its own service. Check the applicable terms again for another carrier or flight.

Build a warehouse-to-warehouse timeline

For a time-critical shipment, record pickup, truck arrival at the terminal, acceptance and screening, departure, and processing and release at arrival. Add applicable formalities at departure, transfer and arrival for international freight. Give the local time and time zone for each event. This shows whether cargo tendered in the evening can make the booked flight and whether the consignee can collect it as soon as it is released.

A connection or a truck-to-air handover adds a dependency on another operator. Confirm who accepts the freight at the handover, whether separate release or a new waybill is needed, what buffer is allowed, and where the shipment will stay if it is rolled. In a China–Europe request, mark each confirmed leg separately. A transfer service listing alone does not confirm a through route or available space.

Compare quotations for the same service scope

Check where responsibility starts and ends in each quotation. Terminal-to-terminal and door-to-door prices cover different operations. Compare the air leg and its chargeable weight in one line, and pickup, handling, storage, release and final delivery in separate lines. Confirm which operations are charged only if delays occur and when any included storage ends.

For several e-commerce orders, price direct shipment and consolidation separately. A consolidated shipment may simplify procurement, but it takes time to assemble and document the freight and break it down at destination. Compare customer promises with the date the whole shipment will be ready and check whether a late piece can be removed.

Keep a record for the shipment

Record the terminal, responsible contact, confirmed dimensions, booking, tender cut-off and how changes will be communicated. Before pickup, check that piece markings, the packing list and air waybill data agree. The consignee should have release information and a contingency if the shipment is rolled. This record lets you check cargo readiness and the flight booking separately.