Where the route changes mode

The Trans-Caspian International Transport Route (TITR), also called the Middle Corridor, connects China and Europe through Kazakhstan, the Caspian Sea, Azerbaijan and Georgia. Its overland legs meet a sea crossing. KTZ Express lists Dostyk, Khorgos and Aktau among its Kazakh hubs and identifies Kuryk–Alat as a ferry link.

The onward route depends on the final address. The Azerbaijan Transit Council describes a connection through Georgia on the Baku–Tbilisi–Kars railway to Türkiye and an option via Georgia’s Black Sea ports of Poti and Batumi. Ask which branch the carrier is offering and who takes responsibility for the cargo after the Caspian crossing.

What terminal expansion means

A 19 November 2026 release from Kazakhstan’s embassy in Austria on its OSCE presentation identifies railway upgrades, expansion of the ports of Aktau and Kuryk, and a plan to raise terminal capacity by more than 30% by 2028. That is a stated target. The release also notes that an Aktau port representative called for attention to the falling Caspian water level.

Separate infrastructure figures from sailing confirmation when requesting a quote. Higher design capacity indicates how much a terminal is intended to handle in specified conditions. It does not tell you whether space is available on the requested vessel, when the cargo will be accepted or whether the onward connection is available after discharge.

Where connections can break down

Follow the cargo from the departure station to final release. Ask for the rail and port terminals, the point of transfer to the sea leg and the location that takes the cargo over again on the western shore. For each handover, identify the responsible party, acceptance confirmation and when the incoming party takes responsibility.

If a sailing moves, consider the effect on the whole chain. When a container reaches the port before loading is confirmed, find out which facility will hold it, who notifies the consignee and what happens to the onward booking. If the carrier proposes a different port, request a revised through quote and confirm the connection across the water.

How to compare two through quotes

Give carriers the same inputs: actual addresses, cargo-ready date, cargo details and equipment. Ask them to split the price into overland legs, the sea crossing, terminal work, documentation and final delivery. Separately record the currency, quote validity, free time at the yard and the terms for storage or waiting charges.

Compare transit estimates from the same start event to the same end event. Acceptance at a station to discharge at a port cannot be directly compared with a warehouse-to-warehouse estimate. Enter expected waiting and contingency time for a changed sailing as separate items.

Before you book

1. Which port pair and west-shore route does the operator confirm?

2. Are cargo acceptance, equipment, space on the vessel and the onward connection confirmed?

3. Who contacts the terminals and updates documents if the route changes?

4. What costs and timings change if there is a delay? Base the decision on the carrier’s answer for your shipment.