Kazakhstan pipeline system: oil and gas at a route crossroads

Kazakhstan's pipeline infrastructure is a key element of energy security and the transit economy. The Caspian Pipeline Consortium (CPC) carries the bulk of oil exports.
The Kazakhstan–China oil pipeline and gas pipelines form the eastern energy-flow direction, diversifying supply routes.
Trans-Caspian directions and possible integration with the Middle Corridor are seen as a prospect for greater Eurasian energy connectivity.
Pumping-station modernisation, oil-quality accounting and environmental standards are key tasks for sustainable pipeline operation.