The two measures answer different questions
Kazakhstan’s Bureau of National Statistics (BNS) reports freight carried in tonnes. Freight transport work is the sum of each consignment’s mass multiplied by the distance it travelled. Moving 20 t over 100 km adds 20 t and 2,000 tonne-kilometres.
The release compares the same transport mode over the same ten months in the two years. The table covers rail. The all-modes totals in the same release have a different scope.
What division by tonnes tells you
When numerator and denominator cover the same traffic, their ratio is the mass-weighted average haul. A heavy consignment has more influence than a light one. For 2026, 245.4 billion tonne-kilometres ÷ 279.2 million tonnes ≈ 879 km. This is calculated from the BNS aggregates.
To estimate the change in that ratio, divide the index of tonne-kilometres by the index of tonnes: 1.008 ÷ 0.989 − 1 ≈ +1.9%. Both rates in the release are rounded. The result is approximate, and the rates cannot be used to recover exact prior-year totals.
How fewer tonnes can generate more transport work
In a hypothetical first period, 120 t travel 400 km and 80 t travel 1,000 km. That gives 200 t and 128,000 tonne-kilometres. In the second period, 90 t and 100 t travel the same routes, giving 190 t and 136,000 tonne-kilometres.
Neither route becomes longer. The longer route makes up a greater share of the tonnage. The average haul rises from 640 km to about 716 km, even though 10 fewer tonnes are carried.
What the totals cannot establish
A shift in commodity mix, route geography or the balance of different haul lengths could produce the observed pattern. Two totals cannot identify which mechanism was at work. They do not isolate the effect of a particular corridor, higher transit volumes, network constraints or operator performance.
Tonne-kilometres are also distinct from train-kilometres and wagon-kilometres. They do not measure empty running, speed, wagon or train loading, revenue or queues at a terminal. Those questions require other data.
How to check a hypothesis of your own
Start with the same months, mode, data revision and reporting scope. Then collect tonnes and tonne-kilometres for comparable groups, such as commodity and route. Separate changes in average haul within each group from changes in each group’s share of all tonnes.
Keep three separate lines in operational reporting: tonnes, tonne-kilometres and their ratio. For a particular section of the network, add data on trains, wagons and passage times at that location. The national figures can prompt a question that local records help answer.