<?xml version='1.0' encoding='utf-8'?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0">
  <channel>
    <title>TransportKZ — Articles</title>
    <link>https://transportkz.com/en/index.html</link>
    <description>Articles on freight, logistics and transport corridors in Kazakhstan.</description>
    <language>en</language>
    <atom:link href="https://transportkz.com/en/feed.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>How to choose a freight route through Kazakhstan</title>
      <link>https://transportkz.com/en/articles/kak-vybrat-marshrut-cherez-kazakhstan.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/kak-vybrat-marshrut-cherez-kazakhstan.html</guid>
      <description>Compare rail entry from China, the Trans-Caspian route and land routes to the south by handover points, quote coverage and cargo acceptance terms.</description>
      <dc:date>2026-11-23</dc:date>
    </item>
    <item>
      <title>How to prepare a cargo shift handover card</title>
      <link>https://transportkz.com/en/articles/kartochka-peredachi-gruza-mezhdu-smenami.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/kartochka-peredachi-gruza-mezhdu-smenami.html</guid>
      <description>A single card gives the incoming shift the last confirmed status of a shipment, the open questions and the next action. This editorial template includes a fictional example for checking a handover log.</description>
      <dc:date>2026-11-23</dc:date>
    </item>
    <item>
      <title>Tonnes and tonne-kilometres: reading Kazakhstan’s rail freight results</title>
      <link>https://transportkz.com/en/articles/kazakhstan-rail-tonnes-tonne-km-2026.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/kazakhstan-rail-tonnes-tonne-km-2026.html</guid>
      <description>In January–October 2026, Kazakhstan’s rail freight tonnes fell 1.1% while tonne-kilometres rose 0.8%. Here is how to read the measures together and when more evidence is needed.</description>
      <dc:date>2026-11-23</dc:date>
    </item>
    <item>
      <title>Transport digest for 23 November: Kazakhstan and the world</title>
      <link>https://transportkz.com/en/articles/transport-news-2026-11-23.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/transport-news-2026-11-23.html</guid>
      <description>The Kyzylorda–Zhezkazgan road reconstruction, Kazakhstan’s container figures, ICAO’s conference declaration and the EU’s October Solidarity Lanes update.</description>
      <dc:date>2026-11-23</dc:date>
    </item>
    <item>
      <title>How to check time zones in a cargo handover log</title>
      <link>https://transportkz.com/en/articles/chasovye-poyasa-v-zhurnale-gruza.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/chasovye-poyasa-v-zhurnale-gruza.html</guid>
      <description>The same clock time does not always mean the same instant. A transshipment log should retain the original timestamp, its offset and a comparable time in UTC.</description>
      <dc:date>2026-11-20</dc:date>
    </item>
    <item>
      <title>How to check UN/LOCODE before requesting a freight quote</title>
      <link>https://transportkz.com/en/articles/un-locode-zapros-stavki-kz.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/un-locode-zapros-stavki-kz.html</guid>
      <description>The code helps everyone agree on which location the route refers to. For comparable quotes, specify the actual cargo acceptance or release point separately and ask the carrier to confirm it.</description>
      <dc:date>2026-11-20</dc:date>
    </item>
    <item>
      <title>Schedule buffers for rail freight in the seasonal peak</title>
      <link>https://transportkz.com/en/articles/daily-2026-11-19-tk1.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/daily-2026-11-19-tk1.html</guid>
      <description>How to set a time buffer, decide when to rebook and recover a schedule after disruption.</description>
      <dc:date>2026-11-19</dc:date>
    </item>
    <item>
      <title>Road transit through Kazakhstan and border preparation</title>
      <link>https://transportkz.com/en/articles/daily-2026-11-19-tk2.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/daily-2026-11-19-tk2.html</guid>
      <description>How to coordinate the crossing, paperwork, arrival time and fallback route for a loaded truck.</description>
      <dc:date>2026-11-19</dc:date>
    </item>
    <item>
      <title>Kazakhstan’s e-commerce growth: planning delivery capacity</title>
      <link>https://transportkz.com/en/articles/daily-2026-11-18-tk1.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/daily-2026-11-18-tk1.html</guid>
      <description>What retail turnover reveals about online sales, and which operating records you need to plan warehouse capacity, peaks and returns.</description>
      <dc:date>2026-11-18</dc:date>
    </item>
    <item>
      <title>Seasonal demand for freight wagons and fleet turnaround</title>
      <link>https://transportkz.com/en/articles/daily-2026-11-18-tk2.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/daily-2026-11-18-tk2.html</guid>
      <description>How to turn a loading forecast into a wagon requirement, allow for unloading and find the limiting step.</description>
      <dc:date>2026-11-18</dc:date>
    </item>
    <item>
      <title>Asia–Europe container routes when schedules change</title>
      <link>https://transportkz.com/en/articles/daily-2026-11-16-tk1.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/daily-2026-11-16-tk1.html</guid>
      <description>What a specific Suez sailing confirms, and how to assess ocean routing and a rail fallback.</description>
      <dc:date>2026-11-16</dc:date>
    </item>
    <item>
      <title>Kazakhstan’s transit infrastructure from project to shipment</title>
      <link>https://transportkz.com/en/articles/daily-2026-11-16-tk2.html</link>
      <guid isPermaLink="true">https://transportkz.com/en/articles/daily-2026-11-16-tk2.html</guid>
      <description>How to distinguish completed work, construction and financing decisions when planning transit freight.</description>
      <dc:date>2026-11-16</dc:date>
    </item>
  </channel>
</rss>
